KOKKINOTRIMITHIA –ASTROMERITIS HIGHWAY
Project Details
Client
CYPRUS PUBLIC WORK DEPARTMENT
Project Type
Bridges | Deep Foundation | Drainage / Storm water | Road | Special Foundation/Piles/Slop Stability/Berlin Walls
Services
DESIGN
Status
2000-2005
This Highway is the continuation of the existing Anthoupolis – Kokkinotrimithia road and will be constructed in three phases.
The first phase, LOT A, shall be the section 8,3 Km long from the end of the existing motorway section Km 0+000 up to Deneia road located at Km 8+300 approximately and will include the following main works :
- Interchange N. 1 at Km 0+520
- Interchange N. 2 at Km 4+350
- Interchange N. 3 at Km 7+900
- Overbriges and related roads N. 1 – 2 – 3 – 4
- Bridges N. 1 – 2 – 3
- Class B – C – D roads and road diversions
- Drainage structures and highway drainage system
- Main drainage channel in Kokkinotrimithia area
- Highway drainage system
- Lighting and Telecommunications system
- Road marking and traffic signs
- Relocation and installation of services and utilities
- Safety barriers and ROW fencing
- Demolition and restoration works of proprieties
- Ancillary works