KOKKINOTRIMITHIA –ASTROMERITIS HIGHWAY

Project Details

Client
CYPRUS PUBLIC WORK DEPARTMENT
Project Type
Bridges | Deep Foundation | Drainage / Storm water | Road | Special Foundation/Piles/Slop Stability/Berlin Walls
Services
DESIGN
Status
2000-2005

This Highway is the continuation of the existing Anthoupolis – Kokkinotrimithia road and will be constructed in three phases.

The first phase, LOT A, shall be the section 8,3 Km long from the end of the existing motorway section Km 0+000 up to Deneia road located at Km 8+300 approximately and will include the following main works :

  • Interchange N. 1 at Km 0+520
  • Interchange N. 2 at Km 4+350
  • Interchange N. 3 at Km 7+900
  • Overbriges and related roads N. 1 – 2 – 3 – 4
  • Bridges N. 1 – 2 – 3
  • Class B – C – D roads and road diversions
  • Drainage structures and highway drainage system
  • Main drainage channel in Kokkinotrimithia area
  • Highway drainage system
  • Lighting and Telecommunications system
  • Road marking and traffic signs
  • Relocation and installation of services and utilities
  • Safety barriers and ROW fencing
  • Demolition and restoration works of proprieties
  • Ancillary works